The UK is set to sign a deal with France’s EDF for the first nuclear plant to start construction in Europe since Japan’s Fukushima disaster raised safety concerns worldwide, at a cost estimated at around £14.2billion.
Under the deal, expected to be announced on Monday, the French utility will lead a consortium, including a Chinese group, to construct two European Pressurised Water Reactors (EPRs) designed by France’s Areva
EDF’s long-time partner China General Nuclear Power Group (CGN), possibly in combination with China National Nuclear Corporation (CNNC), is expected to have a 30% to 40% stake in the consortium, with Areva taking another 10% percent, according to reports.
EDF and the Prime Minister David Cameron’s office declined to comment on the media reports.
The two reactors, each with a capacity of 1.6 gigawatts, would together make up nearly five percent of British generating capacity and increase energy security in the country, which needs to replace 20% of its ageing and polluting power plants over the coming decade.
The project is a boost for the global nuclear industry, which has seen projects cancelled since the 2011 Fukushima disaster.
Germany decided to phase out nuclear power, Italy scrapped a planned nuclear programme and France has pledged to cut atomic power.