Footage has captured the final journey of the Songa Enabler rig as it makes its journey to be laid up over the Winter period.
The rig is now located at the old naval base Olavsvern.
The rig was suspended in November and will be back in operation to drill BlÄmann prospect for Statoil in April.
Take a look at the footage.