Watch as heavy seas batter the COSLRival North Sea accommodation rig before it was put out to pasture.
The COSLRival was built in 1976 and operated as a full-functioning drilling unit until 2004 when it was converted into an accomodation asset.
The rig is currently laid up at Kristiansand, Norway.