Sound Energy said its second Tendara well has now been drilled successfully through the salt cap to a second casing point.
The company said it was carried out at a measured vertical depth of 2,203 metres and the 9 5/8′ casing is now being set and cemented at the top of the Triassic Lower Salt formation.
Sound Energy now plans to drill towards the third and final casing point, directly above the reservoir.