TECHNIP said yesterday it had won two contracts from Talisman Energy (UK) worth about £35million for engineering, procurement and installation for the Auk North and Burghley fields.
The fields will be tied back to Talisman’s Fulmar A platform and the Premier Oil-operated Balmoral floating production vessel, respectively.
The Auk North contract covers the fabrication and installation of a production pipeline, the installation of an umbilical, a power cable and subsea equipment.
At Burghley, the French oil and gas engineering and construction giant’s contract covers fabrication and installation of a production pipeline and a gas lift pipeline, plus the installation of an umbilical and subsea structures.
Technip’s operating centre in Aberdeen will execute the contracts, while the pipelines will be welded at its Evanton spoolbase.