Australian coal bed methane operator Dart Energy says a production test at its Scottish central belt development was a success.
The firm added that the three-month test on its Airth 12 well showed production rates of more than one million standard cubic feet were possible in the area.
Production will now be reduced to minimise flaring and to preserve gas for commercial production. The gas is currently used for local power generation, rather than being sent to the national grid.