BP has started production from the second phase of its West Nile Delta development offshore Egypt.
The project, which produces gas from the Giza and Fayoum fields, was developed as a deepwater, long-distance tie-back to an existing onshore plant.
The West Nile Delta development includes a total of five gas fields across the North Alexandria and West Mediterranean Deepwater offshore concession blocks.
It was originally planned as two separate projects, but BP and its partners realiSed the opportunity to deliver it in three stages, accelerating delivery of gas production commitments to Egypt.
Stage one of the project, which started producing in 2017, included gas production from the first two fields, Taurus and Libra.
The Giza and Fayoum development, which includes eight wells, is currently producing around 400 million cubic feet of gas per day (mmscfd) and is expected to ramp up to a maximum rate of approximately 700 mmscfd.
The third stage of the West Nile Delta project will develop the Raven field. Production is expected in late 2019.
When fully onstream in 2019, combined production from all three phases of the West Nile Delta project is expected to reach up to almost 1.4 billion cubic feet per day (bcf/d), equivalent to about 20% of Egypt’s current gas production.
All the gas produced will be fed into the national gas grid.
BP has an operating stake of 82.75% in the development.
The start-up announced today in Egypt is the second for BP in 2019, following the Gulf of Mexico’s Constellation development, which BP has a 66.6% non-operated stake in.
BP chief executive Bob Dudley said: “This important project start-up benefitted from the excellent working relationship between BP and the Egyptian government.
“With the second stage of West Nile Delta now online, BP has now safely brought 21 new upstream major projects into production over the last three years, keeping us on track to deliver 900,000 barrels of oil equivalent per day by 2021.”
Hesham Mekawi, regional president, BP North Africa, added: “We are proud to have worked with the Egyptian government to deliver this multi-phase, complex project, which plays an important role in both Egypt’s gas supply and BP’s strategy.
“Our story in Egypt now stretches back for more than half a century and, thanks to projects like this, it has a bright future.
“Production from Giza and Fayoum will sustain local energy supply and keep us on track to triple our net production from Egypt by 2020.”