The fracture stimulation is anticipated to take approximately two weeks, after which the equipment will be removed and the flowback will commence.
It has historically taken a few weeks of flowback until stabilized hydrocarbon production occurs.
The company also announces that the Hartgraves 1-6H well continues to perform well, with production rates staying above both the proved undeveloped and the probable case type curves used to estimate the reserves attributed to the Company’s Tishomingo Field.
For the last 20 days, the well has averaged over 400 barrels of oil equivalent per day, of which over 80% is oil.