Technip landed two lump sum contracts for Statoil’s Johan Sverdrup Development and the Oseberg Vestflanken 2 projects.
The service firm is responsible for the fabrication and installation of 29 kilometers of plastic lined 16” water injection flowlines for Johan Sverdrup and fabrication and installation of 7.5 kilometers of 14” production pipeline and 9 kilometers of 10” gas injection pipeline for Oseberg Vestflanken 2.
Odd Strømsnes, managing director of Technip in Norway, said: “We are delighted to have been awarded these two prestigious contracts by Statoil in a very competitive business environment. This demonstrates Technip’s leading position in fabrication and installation of complex flowlines. We are looking forward to execute these projects collaboratively with Statoil in order to achieve the project goals.”
The flowlines will be welded and fabricated at the Technip spoolbase in Orkanger, Norway. The installation will be then carried out by Technip’s Deep Energy, during the second half of 2017.