Equinor has released a video of the huge topsides for the Martin Linge field heading for the North Sea.
The structures, which weigh around 20,000 tonnes each, first arrived in Stavanger four months ago.
They will be lifted onto the steel legs already installed on the field around 26 miles off the Norwegian coast.
In March Statoil finalised a deal with Total to take over operatorship of Martin Linge.
The field has estimated recoverable reserves of 190million barrels of oil equivalent.