Aberdeen’s First Integrated Solutions picks up lift equipment business
The acquisitive Aberdeen equipment rental is on the look out for more deals.
The acquisitive Aberdeen equipment rental is on the look out for more deals.
Solutions to some of these challenges are being developed and, in some cases, can be found in the smarter use of existing equipment and methodologies.
Ørsted has picked a local venture of heavy lift specialist Mammoet to support development of its major Greater Changhua wind projects off Taiwan.
Mammoet has shared footage of its efforts to support assembly of Equinor’s Hywind Tampen project, currently the world’s largest floating offshore wind farm.
Siemens Gamesa Renewable Energy (SGRE) has contracted Mammoet to offload and assemble wind turbines at Djibouti’s Goubet project.
Mammoet has won heavy lifting work from Samsung Engineering at Saudi Arabia’s Aramco Hawiyah Unayzah Gas Reservoir Storage (HUGRS).
Worley has won a maintenance and integrity contract in Oman, working with Arabian Industries Projects (AIP).
Mammoet has delivered a heavy lift terminal crane to the Lagos Deep Offshore Logistic (LADOL) base, in Nigeria.
Mammoet has begun demobilising its heavy-lift equipment at the Dangote Refinery complex, in Nigeria, although the plant is now expected to start up in late 2022.
Netherlands-headquartered Mammoet has agreed to buy UK rival heavy lift and transport firm ALE for an undisclosed fee.
A North Sea port has signed a deal for a 600tonne crane to be stationed there.