BP says “no visible” signs of oil on sea surface after North Sea spill
Oil major BP said there were "no visible signs" of oil on the sea surface after a leak from the Clair platform in the North Sea.
Oil major BP said there were "no visible signs" of oil on the sea surface after a leak from the Clair platform in the North Sea.
Oil major BP could soon resume drilling on its Valhall injection platform after a break was introduced last year.
An offshore worker has given an insight into his working day on Maersk Oil’s Tyra East platform in the Danish North Sea. Using a Go-Pro, Henrik Udengaard, a technical supervisor for the company, captured what his daily routine is like. Take a look at the fantastic footage below.
Bilfinger Industrier has signed a contract with ConocoPhillips for maintenance work on the Ekofisk field.
The Norwegian Petroleum Directorate (NPD) said it plans to sell 3D seismic data from an area southeast of the Troll field.
TWMA said it has secured a £1.5million contract for work with Apache on the WilPhoenix platform in the North Sea Beryl field.
McDermott International said it has been awarded a $454million contract from Pemex for engineering, construction and installation of the Abkatun-A2 platform.
Statoil has been given consent to use the Songa Encourage for the drilling and completion of wells at Asgard and Heidrun.
A CHC-operated helicopter was forced to land on a North Sea installation after a cockpit light illuminated during the flight.
A North Sea helicopter flight landed on the wrong platform after its pilots misidentified their correct landing location eight miles away.
An investigation is underway after a fire broke out aboard the Hibernia platform offshore Canada earlier this week.
Statoil said production has resumed from the Gullfaks B platform after it was stopped following a North Sea helicopter crash.
This footage shows a basking shark swimming close to the Tyra East platform. The video was caught on film by an oil worker around 10 metres from the platform. The basking shark is the second largest living fish, after the whale shark, of three plankton eating sharks. Watch the short clip below.
An investigation is underway by ConocoPhillips after a man fell 2metre on the Ekofisk platform in the Norwegian Sea.
Repairs to the helideck of the Gudrun platform have been made after cracks were uncovered in the substructure earlier this year.
An investigation has been launched by CNR International after an incident during a lifting operation on the Murchison platform.
This video marked the first steel being cut for the Johan Sverdrup platform on the Norwegian Continental Shelf.
A shut down of a North Sea platform has moved into its eighteenth day after a suspected gas leak. Production was suspended on Boxing Day while a “comprehensive” investigation continues into the incident. The platform normally produces 21,000boepd – with an estimated 378,000 barrels on hold until operations have resumed.
The Norwegian Petroleum Safety Authority has found a number of non-conformities on Statoil’s Valemon platform in the North Sea.
A North Sea platform has moved into its eleventh day of shut down as a "comprehensive" investigation by Marathon Oil continues into the cause of a gas leak. Production has been shut down since Boxing Day, with 73 workers remaining on board the platform, which is about 155miles north east of Aberdeen.
A North Sea platform is believed to have entered its tenth day in shut down as investigations continue into the cause of a gas leak on board the installation. Production was shut down on Marathon’s Brae Alpha platform on Boxing Day after an alarm was raised. It is believed 73 workers remain on board the platform which is about 155miles north east of Aberdeen.
Take a look back at some of Energy Voice’s most watched videos from the past year.
A north Sea platform remained shut down last night after a gas line ruptured on board the Brae Alpha. US oil and gas giant Marathon said it was conducting a “comprehensive investigation” into the incident which happened on Boxing Day. The firm said 73 workers remain on board the platform which is which is about 155 miles north east of Aberdeen after initial plans to evacuate were called off.
As wrap up 2015, Energy Voice takes a look back at some of the top stories that have peaked readers interest in the past year.
Take a look back at some of Energy Voice’s most watched videos from the past year.