Production stops amid ‘smoke development’ on Sleipner B
Smoke detected on Equinor's Sleipner B platform in Norweigan waters has stopped production and emergency vessels have been called in.
Smoke detected on Equinor's Sleipner B platform in Norweigan waters has stopped production and emergency vessels have been called in.
Investigations are ongoing into a series of oil and gas releases at Harbour Energy’s problem plagued Tolmount project.
Carbon capture and storage (CCS) is now firmly on the agenda as a way of mitigating at least some of the impacts of climate change.
Equinor is expecting production to begin in September for the first of its cross-border fields in the North Sea.
Dutch contractor Heerema's new, LNG powered crane vessel has passed sea trials and load tests with flying colours.
Carbon capture and storage remains firmly on the agenda as a way of mitigating at least some of the impacts of climate change.
Exxon Mobile has been given consent to extend the lifetime of its Sigyn field activities.
A video has emerged showing a North Sea accommodation vessel living up to its name.
American multinational ExxonMobil has received consent to extend the asset lifetime of the Sigyn field.
Statoil is set to sign the modifications contract for its Sleipner field tomorrow, according to project director Tom Elseth.
Statoil has been hit with a number of improvement points on the Sleipner complex after an audit was carried out by the Norwegian Petroleum Safety Authority (PSA).