On May 16, 30 new cabins were installed on the platform Oseberg C on the Norwegian Continental Shelf approximately 130 km outside of Bergen.
The heavy lift was two-years in the making. Watch it unfold below.
On May 16, 30 new cabins were installed on the platform Oseberg C on the Norwegian Continental Shelf approximately 130 km outside of Bergen.
The heavy lift was two-years in the making. Watch it unfold below.